Click to see our work WhatsApp Email Us
Need custom sportswear? Free digital mockup in 24 hours. WhatsApp us.
Brands & Teams — MOQ 20–25 pieces · private label · worldwide shipping.
📖 Manufacturer Guides — real specs, honest answersMOQ 20–25 Pieces Per Design · Lower on Request · No Limit for BrandsFree 24h Digital Mockup · Worldwide Shipping from Sialkot

How to Start an Activewear Brand with a Manufacturer

In short: A first activewear range of three to five styles can go into production with just 20–25 pieces per design — roughly 60–125 garments in total. ZipaSports, a custom sportswear manufacturer in Sialkot, Pakistan (Est. 2005), takes new brands from a free 24-hour digital mockup to a physical sample in 5–7 days and bulk production in 15–25 business days after design approval.

Step 1: Plan a focused first range of 3–5 styles

A first activewear range of three to five styles is easier to fund, sample and sell than a full catalogue. Every extra design adds its own sampling round, its own minimum quantity and its own unsold-stock risk, so a tight range keeps your first production run small enough to test the market properly.

A common starting line-up is high-waist leggings, a matching sports bra, a training t-shirt and — for colder markets — a hoodie. A colour-matched set photographs well, merchandises as an outfit, and lets one fabric booking cover several styles.

Decide who the range is for before you decide what is in it. A brand aimed at lifters needs different cuts and fabric weights from one aimed at yoga or running, and that single decision drives every fabric, fit and decoration choice that follows.

Step 2: Prepare a tech pack — or send reference samples

You do not need a finished tech pack to start manufacturing activewear, but you do need to communicate each design clearly. A tech pack — flat drawings, measurements, fabric, colours and label placements in one document — removes guesswork and shortens the sampling stage. Our tech pack guide covers what to include, section by section.

If you cannot produce a tech pack yet, reference garments work. Send photos of an existing garment you want to improve on, note what you would change — waistband height, leg length, logo position — and the factory drafts the specification with you. Fully custom size charts are part of the process, so your fit does not have to copy anyone else's.

Whatever format you use, fix your logo artwork early. Vector files (AI, EPS, PDF) or high-resolution PNGs are needed for clean printing and embroidery, and chasing artwork mid-project is a common cause of delay.

Step 3: Choose fabrics that match the styles

Activewear fabric is specified by fibre blend, stretch and weight in GSM — grams per square metre. The right weight depends on the garment: leggings need compression and squat-proof opacity, seamless sets need softness and stretch, hoodies need warmth. The ranges below are the options we run for new brands; the full list is on our fabrics page.

StyleTypical fabricWeight
Leggings and compression wearNylon- or poly-spandex, 4-way stretch, 12–20% elastane240–300 GSM
Sports brasNylon- or poly-spandex, 4-way stretch240–300 GSM
Seamless setsSeamless knit180–260 GSM
Training t-shirts and jerseys100% polyester interlock or mesh140–180 GSM
Hoodies and joggersFleece (performance fleece 240–300 GSM)280–350 GSM

GRS recycled polyester options are available on request for brands building a sustainability story, with certificate copies available on request. If your range centres on sports bras and seamless sets, ask for fabric swatches at the sampling stage so you can compare hand-feel before committing.

Step 4: Sample before you commit to production

Sampling happens in two stages: a free digital mockup within 24 hours, then a physical sample in 5–7 days. The digital mockup shows your design rendered on the actual garment, so colourways and logo placement get checked before anything is cut or stitched.

Once the mockup is approved, the physical sample is produced in your final fabric, print and trims. It is charged at sample cost, and that cost is credited against your bulk order when you proceed — the sample is an advance on production, not an extra fee.

Wear-test the sample hard. Wash it, squat in it, check seam recovery and print durability after several cycles. A fault found at sample stage costs one garment; the same fault found after bulk production costs the whole run.

Step 5: Budget around the real MOQ

The minimum order at ZipaSports is 20–25 pieces per design, with lower quantities on request and no MOQ limit for sportswear brands. In practice that means a three-style range can go into production with roughly 60–75 garments, and a five-style range with roughly 100–125 — a testable first drop rather than a warehouse commitment. Our MOQ guide for apparel startups explains how per-design minimums interact with sizes and colourways.

On startup cost: there is no single figure, because cost depends on range size, fabric, quantity per design, decoration methods and destination. Every order is quoted individually. Send your designs on WhatsApp (+92 300 7019281) for a same-day quote and a free 24-hour mockup, and build your budget from real numbers rather than estimates.

Step 6: Set up private-label branding from day one

Private labelling is what turns a batch of garments into a brand, and at ZipaSports it is all produced in-house. Branding is applied during production, so your first run arrives retail-ready rather than as blank stock you have to finish yourself.

Supply your branding artwork alongside your garment designs so labels and tags are approved on the same physical sample. Adult sizes run XS–5XL, women's XS–4XL, plus youth sizing, and the size tags follow whichever chart you settle on.

Step 7: Know the timeline before you set a launch date

Bulk production takes 15–25 business days after design approval, with an express service of 7–12 days when a launch date is fixed. Work backwards from launch day: add sampling, production and shipping together, then build in a buffer for sample revisions.

StageYou provideThe factory providesTypical time
Digital mockupDesigns or reference photos, logo files, colour referencesFree rendered mockup of each styleWithin 24 hours
Physical sampleMockup approval, size chart or fit notesStitched sample in final fabric and print, at sample cost credited against the bulk order5–7 days
Bulk productionSample approval, size and colour breakdownCutting, sublimation or printing, stitching, labelling, quality checks and packing15–25 business days (express 7–12)
DeliveryDelivery address and contact detailsDHL, FedEx or UPS air freight5–10 days (sea freight 3–6 weeks)

Production runs under ISO 9001:2015 quality management, and fabrics are OEKO-TEX Standard 100 certified — certificate copies are available on request.

Step 8: Plan launch logistics and your first reorder

Air courier by DHL, FedEx or UPS delivers a first activewear production run in 5–10 days. That covers the markets ZipaSports ships to regularly — the UK, USA, Canada, Australia, Germany and wider Europe, and the UAE and GCC. For a launch drop, air freight is the practical choice; sea freight at 3–6 weeks suits larger restocks planned well in advance.

Plan your reorder trigger before you launch. Because the per-design minimum stays at 20–25 pieces, you can restock only the styles, colours and sizes that actually sell instead of guessing a full second run — and add one or two new styles per drop, which is how a tight range grows into a catalogue. Many of the same fabrics and decoration methods also carry across into hoodies and outerwear when you expand.

ZipaSports was founded in 2005 and operates as a Government of Pakistan licensed exporter from Sialkot, with certificate copies available on request. To start, send your designs or reference photos on WhatsApp at +92 300 7019281 or email zipasports@gmail.com — messages are answered within 2 hours during office hours (Mon–Sat, 9:00–18:00 PKT), and the free 24-hour mockup is the first concrete step from idea to production.

Frequently Asked Questions

How many designs do I need to start an activewear brand?

Three to five styles is enough for a first activewear range. Each design carries its own 20–25 piece minimum, so a three-style range means roughly 60–75 garments and a five-style range roughly 100–125. Start narrow, see what sells, and add styles in reorders.

How much does it cost to start an activewear brand?

There is no single startup figure, because cost depends on range size, fabric, quantity per design, decoration methods and destination. Every order is quoted individually. Send your designs on WhatsApp (+92 300 7019281) for a same-day quote and a free digital mockup within 24 hours.

Do I need a tech pack to work with an activewear manufacturer?

No — a tech pack helps but is not required. Clear reference photos of existing garments plus notes on what you would change are enough for the factory to draft the specification with you. Fully custom size charts are built as part of the process.

Are activewear samples free?

The digital mockup is free and arrives within 24 hours; the physical sample is not. A stitched sample takes 5–7 days and is charged at sample cost, which is then credited against your bulk order when you proceed to production.

How long does it take to launch an activewear line once designs are ready?

A first production run moves through a 24-hour digital mockup, a physical sample in 5–7 days, bulk production in 15–25 business days after approval, and DHL, FedEx or UPS delivery in 5–10 days. Express production of 7–12 days is available when a launch date is already fixed. Add a buffer for sample revisions when you set the date.

Sourcing custom sportswear? Talk to the factory.
Free digital mockup in 24 hours · MOQ 20–25 pieces per design · lower on request · no MOQ limit for sportswear brands