
Custom Cross Country Vests
ZipaSports manufactures custom cross country vests in Sialkot, Pakistan, with a minimum order of 20–25 pieces per design and 15–25 business day production. Ordered by cross country clubs, schools and county squads for league fixtures and championship races through the winter.
A 150 GSM polyester interlock body, slightly heavier than a summer track singlet so it holds shape when wet and muddy, with 140 GSM mesh side panels for airflow. Armholes and neck are bound in self-fabric and bar-tacked, and reinforced pin points at the chest and back stop race numbers tearing the panel. Club stripes and crest are sublimated so the design survives repeated washing after muddy races.
Send your logo, colours and reference designs — or just an idea — and the design studio returns a free digital mockup within 24 hours. OEM and private-label orders ship with your own woven labels, size tags and branded packaging, applied in-house.
- MOQ 20–25 pcs per design
- Free 24h digital mockup
- Production 15–25 business days
- Ships worldwide from Sialkot
- Private-label ready
Cross Country Vests Specifications & Options
| Fabric / materials | 150 GSM polyester interlock with 140 GSM mesh side panels |
|---|---|
| Fabric | 150 GSM polyester interlock, 140 GSM mesh panels |
| Armholes | Self-fabric binding, bar-tacked |
| Number points | Reinforced pin points front and back |
| Decoration | Dye sublimation, screen printing, embroidery, DTF or heat transfer — matched to the design |
| Sizes | Adult XS–5XL, women's XS–4XL, youth sizes; fully custom size charts |
| Minimum order | 20–25 pieces per design; lower on request; no limit for sportswear brands |
| Sampling | Free digital mockup in 24 hours; physical sample 5–7 days at cost, credited on bulk order |
| Production time | 15–25 business days after design approval; express 7–12 days |
| Shipping | Worldwide — DHL/FedEx/UPS express 5–10 days; sea freight for bulk |
📏 Need measurements? See the sportswear size chart guide — or send your own size chart and we cut to it.
Cross Country Vests Customisation Options
- Standard or long body length
- Reinforced pin points fitted
- Sublimated club stripes and crest
- Athlete name on the back yoke
- Contrast side mesh panels
- Women's fit with shaped side seam
- Junior grading for age-group squads
- Matching long-sleeve winter version
- Fully custom patterns & made-to-spec designs — send a tech pack, sketch or sample
Cross Country Vests — Frequently Asked Questions
What is the minimum order for custom cross country vests?
20–25 pieces per design. Lower quantities are possible on request, and there is no MOQ limit for sportswear brands and companies.
What are cross country vests made from?
150 GSM polyester interlock with 140 GSM mesh side panels. GRS-certified recycled fabric options are available on request.
How long does production take?
Bulk production takes 15–25 business days after design approval, with an express 7–12 day service at additional cost. A free digital mockup is delivered within 24 hours of your enquiry.
How is a cross country vest different from a track singlet?
It is a slightly heavier knit that keeps its shape when soaked and muddy, cut a little longer in the body so it stays tucked over a full race. Track singlets are lighter and cut shorter for speed rather than durability.
Will mud stains come out of a light club colour?
Rinse cold as soon as possible rather than letting mud dry into the fibre, then wash at 30C. Sublimated colour is unaffected by repeated washing, so the vest can be laundered hard without the design fading.
Can we have club stripes that line up at the side seam?
Yes. We sublimate the artwork onto the panels before cutting, matching the stripe position on each pattern piece so the stripe continues cleanly across the side seam on every size.
How much do custom cross country vests cost?
Pricing depends on fabric choice, order quantity, decoration and destination, so every order is quoted individually. Send your design and quantity on WhatsApp (+92 300 7019281) for a same-day quote and a free digital mockup within 24 hours.
Related resources
More Athletics products





